  • Mobilisation to site and site set up including temporary power and lighting.
  • Demolition of internal walls, both masonry, metal stud and timber stud.
  • Removal of suspended ceilings, raised access floors and timber boarded floors.
  • Removal of a number of toilet pods that had initially been constructed off site and built into the building structure.
  • Removal of steel staircase including temporary protection upon its removal.
  • Removal of all debris via site specific scaffold fully boarded and sealed rubbish chutes to prevent dust and debris nuisance.
  • Working off tower scaffolds, removal of mechanical and electrical services above high level ceiling grids and risers, including the removal and disposal of lagging from the ventilation services.
  • Removal of air handling units/ducting with hand tools, grinders and hot cutting equipment, monitored by an appointed fire warden, having set up fire fighting equipment and issued hot work permits.
  • Waste management including the development of the Waste management Plan that was passed onto the client upon completion along with an O&M manual and drawings that clearly indicated where remaining services were retained.